Reliability Of of Radiation Portal Monitor Using False Alarm Testing
Synopsis
As an effort to improve security and safety in the nuclear facility area, The Center for Nuclear Facility Engineering, National Nuclear Energy Agency of Indonesia (PRFN-BATAN) has developed a system for measuring Radiation Portal Monitor (RPM). This facility will be installed at the entrance and exit gates in the nuclear facility area which aims to monitor the safety of radioactive substances in vehicles entering and leaving the nuclear facility area. To ensure the reliability of the radiation portal monitor that has been made, testing and certification of the equipment must be carried out in accordance with the reference standard SNI IEC 62244:2016. One of the radiation characteristics requirements of the standard is to perform a false alarm test with the requirement that no unexplained alarms occur during a 100 hours operating period with the monitor in a stable background. Testing activity was carried out in the Serpong Nuclear Area - National Nuclear Energy Agency of Indonesia in the behind of Building 71. The test is carried out for 5 days by monitoring the detection of false alarms at RPM which is operated for 100 hours. The results of background testing for 5 days obtained an average count of 745 cps. However, no alarm data is activated (background or occupation), there is an increase in the count due to rain, but it does not activate the alarm.
Downloads
Pages
Published
Series
License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.


























